BASE OPERATIONS // PROCEDURES
Operations Manual
Five procedures covering the shift from the first sweep to a graded signal on the market. Written as procedure, not walkthrough: each page states what the console is doing and why the step matters, so a change of patch does not invalidate the whole page.
- PROCEDURES
- 5
- SECTIONS
- 23
- READ
- 37min
- 01
Your First Shift
ONBOARDING 7 MINBase layout, the five console panels, and the two conditions that must both read 100% before a single byte can be downloaded.
- What the base actually is
- The five panels
- Two hundred percents
- First hour, in order
- 02
Scanning and Locking a Signal
PROCEDURE 8 MINThe sweep, the polarity and frequency adjustment, and why an unrefined zero-level return is what the job actually asks for.
- Load media before you sweep
- Zeroing in
- Why zero level matters
- When to throw it back
- What a return is worth
- 03
The Daily Task Loop
ROUTINE 9 MINThree kinds of submission - signals, floppy data and tapes - plus the drive handoff that turns a pile of media into a completed task.
- The task arrives by mail
- Signals: raw, not refined
- Floppy data and the relay stations
- The zip drive handoff
- Tapes and hash codes
- A shift that does not waste a day
- 04
Radar Towers and Fuses
MAINTENANCE 6 MINWhy the coordinates panel suddenly errors out, what a blown fuse has to do with lightning, and how to find the tower again.
- The symptom
- Fuses are consumables
- Finding the tower
- The repair
- 05
Drives, Servers and Signal Grades
LOGISTICS 7 MINWhat the server bank really controls, how media capacity shapes a shift, and the road from a raw return to a graded one.
- The server misconception
- Media capacity is a budget
- The grade ladder
- What to buy first
Procedures were assembled from field notes and corroborated against creator walkthroughs recorded 2026-10-22; the checkability ledger lives outside the site. No figure on these pages is estimated - catalogue numbers link to the data pages above.